Orange County Administrative Complex
Consolidated networking across a 12-building government campus onto a single fiber backbone with unified wireless, security, and AV systems.
$800K
Annual Cost Savings
12 buildings
Connected via Fiber Backbone
The Challenge
What We Were Facing
Twelve buildings with independent network infrastructure, separate ISP contracts, and incompatible AV systems in 30+ meeting rooms. Annual infrastructure spending exceeded $2.1 million across siloed departments.
Our Solution
How We Solved It
Installed campus-wide single-mode fiber backbone connecting all 12 buildings, deployed centrally managed Wi-Fi 6E throughout, standardized conference room AV with Crestron Flex systems, and implemented a unified IP camera platform with badge-based access control at all entry points.
The Results
Measurable Outcomes
Consolidated 12 ISP contracts into one, saving $800K annually.
IT team reduced from 18 to 12 staff through centralized management.
Meeting room AV setup time dropped from 20 minutes to under 60 seconds.
All buildings now share a single resilient network.
“Summit connected all twelve of our buildings onto one network in under four months. The annual savings alone paid for the entire project within two years.”
Thomas Nakamura
Director of Information Technology, Orange County Administrative Services