Skip to main content
SummitDNC

All Case Studies
ManufacturingRiverside, CA

Pacific Automotive Components

OT/IT network convergence for a 200,000 sq ft manufacturing facility, enabling real-time production monitoring while maintaining air-gapped security for industrial controls.

35%

Reduction in Unplanned Downtime

10 weeks

Full Implementation

The Challenge

What We Were Facing

Separate OT and IT networks with no visibility into production line performance. Unplanned downtime averaging 12 hours per month. No remote monitoring capability for plant managers.

Our Solution

How We Solved It

Designed converged OT/IT network with industrial-grade switches, deployed fiber backbone between production zones, implemented secure DMZ between OT and IT networks, and installed 24/7 monitoring with automated alerts.

The Results

Measurable Outcomes

Unplanned downtime dropped 35% in the first quarter.

Plant managers gained real-time dashboards accessible from any location.

Mean time to repair reduced from 4.2 hours to 1.8 hours.

The OT/IT convergence project gave us real-time visibility into our production lines. Unplanned downtime dropped 35% in the first quarter alone.

Robert Kim

VP of Operations, Pacific Automotive Components

Ready for Results Like These?

Contact Summit DNC for a free site survey and project proposal tailored to your organization.

Licensed & Insured (C-7, C-10)BICSI Certified15-Year WarrantyBBB Accredited
Get a Free Quote